Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Cardiff
    • Swansea
    • Christmas
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    Wales 247
    Home » A55 junction 27 Talardy Interchange Bridge Strengthening Works
    Construction

    A55 junction 27 Talardy Interchange Bridge Strengthening Works

    Rhys GregoryBy Rhys GregorySeptember 26, 2020No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Essential maintenance work to strengthen the bridges on the A55 at junction 27 is now underway.

    Built in 1970, the three bridges supporting the A55 through the Talardy Interchange are being strengthened so they can continue to carry heavy loads safely in the years to come.

    The scope of works includes concrete repairs, replacement of movement joints, carriageway resurfacing and the addition of steelwork to strengthen the bridge decks.

    This is essential to protect the safety of the travelling public and to provide unrestricted passage for heavy vehicles which would otherwise need to be diverted off the A55 on to local roads.

    To minimise disruption the work is being carried out 24 hours a day to ensure that the works are completed as quickly as possible. Traffic will be unaffected at the weekends throughout the project to ensure that busier traffic flows are not impacted.

    The works are programmed to take 11 weeks depending on weather conditions and are scheduled to be completed by 27 November, but every effort will be made to finish ahead of schedule if that is possible.

    Eastbound and westbound lane closures are programmed to be in place for four weeks from September 28th, with full overnight carriageway closures due to take place for two weeks from November 8th.  The junction 27 eastbound on-slip and westbound off-slip will also be closed when needed

    Some work will be done out of sight of motorists in protected areas.

    The work is being carried out when traffic levels are lower and when the weather is usually better than later in the winter.

    Every effort will be made to keep disruption to a minimum but some delays should be expected when approaching junction 27 when travelling westbound on Mondays –Thursdays.  Traffic will be directed to stay on the A55 rather than use alternative local traffic routes which are unsuitable for use as diversion routes when traffic flows are high.

    Transport Minister Ken Skates said: “The safety of the travelling public is our priority.  The essential work at Talardy will increase the resilience of the bridges here for the future, helping reduce incidence of unplanned disruption or heavy loads having to be diverted to smaller roads.”

    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    West Wales housing development nears completion following major investment

    December 18, 2025

    South Wales Transport sold to Tower Transit in major Swansea deal

    December 16, 2025

    Planning reforms come into force as Wales targets quicker decisions

    December 15, 2025

    Comments are closed.

    Latest News in Wales

    New chapter for Lion Art Hotel and Restaurant in Mid Wales

    December 18, 2025

    New Swansea community services hub attracts thousands of visitors

    December 18, 2025

    Man charged after knife reported at Cardiff retail park

    December 18, 2025

    Stalker jailed after sending threatening messages to woman

    December 18, 2025

    Cardiff park swans die from avian flu

    December 18, 2025

    Bus timetable changes confirmed for Pembrokeshire services

    December 18, 2025

    Duffryn residents urged to shape how £500k community fund is spent

    December 18, 2025

    Walking and wheeling route to Monmouth town centre now fully open

    December 18, 2025

    Wales launches first Women’s Health Research Centre to tackle inequalities

    December 18, 2025

    Automatic voter registration pilot adds over 16,000 voters in Wales

    December 18, 2025
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]
    Contact: 02922 805945

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2025 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.