Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Cardiff
    • Swansea
    • Christmas
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    Wales 247
    Home » First students lay foundations for the future on inaugural suite of construction programmes
    Construction

    First students lay foundations for the future on inaugural suite of construction programmes

    Rhys GregoryBy Rhys GregoryOctober 21, 2024No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    STUDENTS are laying the foundations for a future in construction on a groundbreaking new suite of apprenticeship programmes.

    The first cohort of learners have taken their places on Wales’s first fully funded Construction Degree Apprenticeships.

    The students will spend two years at Coleg Cambria’s Bersham Road site in Wrexham before completing a final two years at Wrexham University.

    Funded by Welsh Government, the qualifications will give them the opportunity to gain pivotal work experience while achieving a degree, opening-up a wide range of career opportunities in Construction Management, Building Surveying, Civil Engineering, and Quantity Surveying.

    Welcoming the group, Karl Jackson, Site Lead at Coleg Cambria Bersham Road – which has undergone a multi-million pound transformation in past years – and Assistant Principal for the Institute of Technology, said: “The learners have already settled into the programme and are looking forward to mixing the theoretical and practical sides of the industry, to boost their skills, knowledge and confidence.

    “The degree apprenticeships will develop their professional competence but also give them vital real-time, real-life training in a high-quality setting.

    “We are delighted to collaborate with Wrexham University on this and look forward to seeing the partnership grow in the years ahead.”

    Launching the degree apprenticeships over the summer, Professor Maria Hinfelaar, former Vice-Chancellor at Wrexham University, said: “As a university, we continuously review our portfolio and learning pathways across all levels to meet the needs of learners and employers – and the Construction Degree Apprenticeships are a tremendous example of meeting those needs.

    “From engagement with employers in the region, we know that they are excited that these are launching here in Wrexham.”

    The programmes are designed to meet the knowledge, skills and behaviours set out in the Welsh Government Framework, alongside the requirements of the professional bodies.

    The launch of the pathway was the result of strong co-operation and engagement relevant bodies and representatives in Wales including Welsh Government, The Construction Industry Training Board (CITB), The Higher Education Funding Council Wales (HEFCW), The Joint Board of Moderators (JBM), The Institution of Civil Engineers (ICE), The Chartered Institute of Building (CIOB), and The Royal Institution of Chartered Surveyors (RICS).

    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    Plans move forward for new school serving Blaenymaes and Portmead

    December 15, 2025

    Pupils mark milestone as new ALN school in Clydach Vale takes shape

    December 15, 2025

    Planning reforms come into force as Wales targets quicker decisions

    December 15, 2025

    Comments are closed.

    Latest News in Wales

    Ruth Jones spends day with RNLI crews ahead of festive TV special

    December 15, 2025

    Bridgend boy looks forward to first Christmas at home after life saving kidney transplant

    December 15, 2025

    Cardiff business group sets out demands to save city centre high streets

    December 15, 2025

    Monster Jam roars back into Cardiff for 2026 stadium spectacular

    December 15, 2025

    Welsh Cup finals to return to Rodney Parade for third year running

    December 15, 2025

    Paralympic champion Ben Pritchard wins top Welsh sports honour

    December 15, 2025

    Manon Steffan Ros named new presenter of BBC Radio Cymru arts programme

    December 15, 2025

    Amber rain warning issued for Wales as flooding risk increases

    December 15, 2025

    Huge cannabis operation uncovered in former Neath M&S building

    December 15, 2025

    New regeneration plan aims to create a greener and fairer Cardiff

    December 15, 2025
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]
    Contact: 02922 805945

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2025 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.