fbpx

My name is Rhys, a first time dad blogging about my adventures and experiences of being a parent. [email protected]

Weekend road closure for A469 between Pontlottyn and Tirphil

Credit: Google

During recent routine highway inspections, further movement has been noted on the A469 Between Pontlottyn and Tirphil which has resulted in cracks over several areas both within the current live lane and the lane that is closed to traffic. Some of these cracks are associated with vertical displacements. CCBC will be undertaking reinstatement works in these areas.

The resurfacing and crack sealing that is required is in the lane that is currently open to traffic and therefore will require a full road closure to remediate.

It is currently planned that this will take place on Sunday 23rd June 2024.

The road will be closed between 8am and 6pm, with a signed diversion route in place (PDF).

However, the works are subject to weather conditions and as a result may be changed at short notice.

Advance signs advising of the road closure will be placed on the approaches to the lights in advance of the road closure.